COMMISSIONING & TRAINING

All in Two Proven Steps

From First Power-Up to Confident Operators

Every MetalPress machine leaves our plant fully tested, but its real job starts on your floor. Our two-step Commissioning & Training program makes sure installation turns into production quickly and safely—while giving your operators the know-how to keep it running at peak performance.

Step One:

Professional Commissioning

Dialed-in performance from Day One.

  1. Pre-Arrival Review
    • We confirm utilities, anchor points, and floor loading so your site is ready when the truck rolls in.
  2. Setup Supervision
    • Factory technicians will supervise positioning, levelling, and bolt-down.
    • Hydraulic, electrical, and safety circuits are verified against OEM specs.
  3. Functional Start-Up & Verification
    • Pressure, speed, and stroke limits are verified.
    • Light-curtains, interlocks, and e-stops are validated.
    • A Site Acceptance Test (SAT) proves cycle time, force accuracy, and repeatability on your actual parts.
  4. Hand-Off Package
    • You receive calibration certificates, parameter backups, and a commissioning report so maintenance teams have a clean baseline.

Result: Your MetalPress system hits rate quickly—without teething problems or safety surprises.

Step Two:

Operator & Maintenance Training

Knowledge that keeps uptime high and scrap low.

  1. Hands-On Operator Sessions
    • Shift-friendly classes on machine controls, safe loading, and recipe change-overs.
    • Real part runs so crews build muscle memory, not just theory.

  2. Maintenance Best Practices
    • Daily, weekly, and quarterly checklists tailored to your duty cycle.
    • Live walk-through of lube points, filter swaps, and alarm resets.

  3. Digital Learning Toolkit
    • Interactive PDFs, wiring diagrams, and quick-reference videos—accessible on any device.
    • Parameter cheat-sheets and troubleshooting flowcharts for faster fault recovery.

  4. Competency Sign-Off
    • We issue training certificates and retain attendance records for your safety audits and ISO files.

Result: Operators run the machine with confidence, and maintenance teams prevent problems before they start.